Nice little construction update from the slopes of Loon Mountain in New Hampshire where they’ve been hard at work on the first 8-pack chairlift in the East. The eight-seat D-Line Doppelmayr chair with its ergonomically shaped heated seats and tinted bubble is a massive upgrade from the Kancamagus Express Quad it will be replacing. The new uphill capacity of the 8-pack will be 3,500 skiers per hour. Lots more work to be done, we’ll be sure to keep you updated over the summer:

NORTH AMERICAโ€™S MOST TECHNOLOGICALLY ADVANCED CHAIRLIFT COMES TO THE EAST

Kancamagus 8, or Kanc 8, is an eight-seat D-Line Doppelmayr chair with ergonomically shaped heated seats and tinted bubble. Set to replace the Kancamagus Express Quad, the Kanc 8 will transport 3,500 skiers per hour to the top of some of Loonโ€™s most popular terrain.

This new high-speed, eight-person chairlift will also feature an automatic restraining bar, individual footrests and an adjustable loading carpet for young skiers and riders. The D-Line holds 205 new developments, including 31 innovations and 14 patents, making it the most modern chairlift in the world. Featuring new Doppelmayr Direct Drive (DDD) technology, a gearless drive allows whisper-quiet operation and low maintenance, while increasing energy efficiency. Other notable highlights of the new Kancamagus 8 include:

  • Travel speed of 18 ft. per second, or 1,100 ft. per minute
  • Weather-blocking tinted bubbles
  • Raiseable loading carpet
  • Conical towers
  • Bike haul capability

Have any post ideas or corrections? Reach out to me: ian@unofficialnetworks.com.